GAC Qatar opens new sustainability-built warehouse and office facility in Qatar Free Zones

Published on December 15, 2022
Advertisement

GAC Qatar has opened a new sustainably-built 27,000 m2 multi-user contract logistics facility and office building in Ras Bufontas Free Zone, in partnership with Qatar Free Zones Authority (QFZA), adding to the company’s existing infrastructure and boosting customer services and offerings in local and international markets.

The new facility features up to 40,000 pallet positions, as well as four temperature and humidity-controlled chambers, to meet the requirements of a wide range of sectors, including food and beverages, fast-moving consumer goods, retail and telecommunications. It also features 500 m² of dedicated value-added services space and 2,000 m² of mezzanine storage to meet customers’ requirements and international quality standards.

Sustainability

GAC Qatar’s newest contract logistics facility and office building has been built with sustainable materials and methods, as well as the latest technology to ensure the company remains consistent with the wider GAC Group’s commitment to sustainability and innovation.

The facility has attained the Global Sustainability Assessment System (GSAS) certification and boasts several energy-saving features, such as environmentally friendly controlled thermal insulation, thermal transmittance technology, advanced building management systems and LED lighting with motion sensors. It is also partly powered by solar energy and uses 100% recycled water from in-built storage building air coolers.

Plans are also in the pipeline to improve the facility further with the installation of solar panels, a sanitary wastewater treatment plant for irrigation, and a plantation and irrigation system that requires low water consumption.

Strategic location

GAC Qatar’s newest facility is set to benefit from the Middle Eastern country’s advanced infrastructure, as well as its position within Qatar Free Zones. It is strategically located in Ras Bufontas Free Zone, next to Hamad International Airport and close to the Umm Al Houl Seaport Free Zone, placing the company in the ideal position to meet the growing demand for efficient and timely delivery of goods.

GAC Qatar General Manager Henrik Althen at the warehouse inauguration ceremony

“The purpose-built contract logistics facility is designed to maximise operational efficiencies and achieve higher productivity to provide quick turnaround time in a lean and agile manner to help customers achieve their supply chain goals,” says Adrian Peiris, Business Manager for Contract Logistics at GAC Qatar.

Henrik Althén, GAC Qatar’s General Manager, adds: “We are excited to reach this latest milestone in our expansion. The opening of the new facility and office building signifies our continued commitment to delivering end-to-end shipping and logistics support from a strategic location for our customers locally, regionally and internationally.”

GAC Qatar’s operations are ISO 9001, 14001 and 45001 accredited, and its latest site will ensure the company continues to deliver world-class services built on quality, safety and sustainability.

Sustainability
GAC Qatar’s newest contract logistics facility and office building has been built with sustainable materials and methods, as well as the latest technology to ensure the company remains consistent with the wider GAC Group’s commitment to sustainability and innovation.

The facility has attained the Global Sustainability Assessment System (GSAS) certification and boasts several energy-saving features, such as environmentally friendly controlled thermal insulation, thermal transmittance technology, advanced building management systems and LED lighting with motion sensors. It is also partly powered by solar energy and uses 100% recycled water from in-built storage building air coolers.

Plans are also in the pipeline to improve the facility further with the installation of solar panels, a sanitary wastewater treatment plant for irrigation, and a plantation and irrigation system that requires low water consumption.

Tags: 
Source: Press release

Related Posts

arrow-down