Please use this form to submit your evaluation for Clean Energy.
Background of organisation, values and goals: Extent to which a brief overview of the background of the organisation, the core values, how these relate to ESG & why the organisation aims to be involved in ESG are provided.
Provide a brief overview of the background of your organisation, and how and why your organisation aims to be involved in ESG.
Balexco is the oldest Aluminium Extrusion Co in Bahrain. Balexco manufactures aluminium profiles for window systems, ladders, etc. The company has been looking at renewable energy, energy efficiency, waste management and employee well being to make the world a better place to live in.
Summary of project: Extent to which a clear summary is provided on the project outlining the objectives, impacts & results as well as the benefits this has had to the organisation & particular team involved in the project.
Provide a clear summary of your project outlining the objectives as well as the benefits this has had to your organisation and particular team involved in the project.
"Balexco went through a formal tender process Solar Power Purchase Agreement (PPA) project in 2022. Based on a detailed evaluation, Clean Max & Kanoo JV has been selected for the 2.4MW project. The signing of the Letter of Intent is on 10th November 2022, in the presence of Ministry’s Renewable Energy team. The project would be immediately started with structural analysis and design. The project includes, conducting a detailed Energy Audit parallel to the design approval and procurement stage. The Energy audit study will detail the current energy consumption, highlight areas of wastage and recommend a plan of action."
Objectives: Extent to which a clear breakdown of the targets that were set to achieve throughout the project, including reference to the impact this has had on the organisation and external party are provided.
Provide a clear breakdown of the targets you set to achieve through your project, including reference to the impact you expected on your organisation and any external party.
Balexco plans to source around 30% of its total electricity needs from renewables and simultaneously reduce by 10% its energy consumption per MT of production by undertaking an energy audit. This will help in reducing the carbon footprint and contribute to the nation’s target to reduce emissions by 30% through decarbonisation by 2035. This will help Balexco in not only reducing cost but also make it more energy efficient in the future. Lastly we would like to set an example for other SME’s to follow so that there is a ripple effect.
Impacts & results: Extent to which details are provided on how the project has benefitted the sustainability realm as well as the organisation, team & the stakeholders
Provide details on how your project has benefitted the sustainability realm as well as your organisation, your team & your stakeholders if relevant.
As per Investopedia, “Sustainability” has three main pillars: economic, environmental, and social. These three pillars are informally referred to as People, Planet, and Profits. Reducing the carbon footprint by reducing the energy being generated from fossil fuels, will help in a cleaner & healthier environment for the community. This project over thirty years will generate a significant carbon footprint reduction by 53,190 MT of carbon dioxide. Further over the project life cycle of 30 years there will be a savings of USD 3.3M & thereby higher profits for the stakeholder. The higher profits would lead to improved compensation for the staff. Thus the project will benefit all the three pillars of People, Planet, and Profits. Balexco will adapt and improve its production process to be more energy efficient and this will help it stay abreast in today’s dynamic competitive environment.
How does this project fit within your overall sustainability goals and ambitions?
Balexco has set various sustainability goals and ambitions but the solar energy and energy audit project is the foundation and the one which will have far reaching implications on this sustainability journey, it has embarked on.
Supporting evidence: Extent to which details are provided for supporting documents and a clear summary of metrics relating to impacts & results, base case metrics that are relevant to the project.
When did you complete the project or expect the project to be completed?
9/10/2023
How many megawatts did you install?
2.4 megawatts
What are your expected annual energy savings (%)?
30%
Expected annual energy savings of this project? (KWh)?
3940800
Expected annual carbon emissions saved of this project? (tCo2e)
1773
Did you partner with a third party to implement this project?
Yes
Which solution provider/ company did you work with to achieve this?
Clean Max, UAE & Kanoo, Bahrain Joint Venture
Team engagement: Extent to which a clear overview is provided on how the team & stakeholders collaborated to drive & implement your project or initiative. Details on number of staff involved in project.
Provide a brief overview of how your team & stakeholders collaborated to drive & implement your project or initiative. Please include details of number of staff involved.
Balexco CFO has been closely working with Engineer Yusuf Ameen on the project right from the pre tendering stage till the signing of the LOI. The maintenance team have been involved during the tender stage. Engineer Yusuf will continue as a Solar Project coordinator on behalf of Balexco. The Ministry Renewable energy team has supported the team throughout this process and have promised to continue the support through the implementation stage as well. Balexco's external lawyers have been involved in the legal review. Balexco's stakeholders have been very supportive as well.
Future implications & brief strategy: Extent to which a clear overview is provided on how the participant will move forward with the specific project, and its longand short-term implications if known.
Provide a brief overview of how you will move forward with this specific project, its future (short-term & long-term) implications if known. Please include metrics where appropriate.
The Solar Project is a 30 year project and will take 10 months’ implement. Even though the signing of the PPA is getting delayed due to the delay in Joint venture formation, the structural analysis and design stage will start from LOI signing so as not to delay the project. The Energy audit will be the early deliverable and based on their recommendations, the company shall put a framework to implement the suggested recommendations in avoiding wastage and improving energy efficiency. The work has already started on some of the expected short term benefits like changing of halogen lamps to LED.
With roots going back to 1962, Tanmiah aims to be a leading integrated producer and supplier for poultry and other meat products in the MENA region. ESG is a critical pillar of our operating strategy and important for all our stakeholders. We aim to become a global, halal and sustainable brand.
Gasification of poultry manure to create biochar. The process will create syngas which will be used to create steam which will then power a turbine to generate clean energy. The project targets our sustainability initiatives of reducing waste sent to landfill, reducing waste sent to landfill and reducing our carbon footprint. This project is primarily being led by the sustainability team with technical support from PMO (Project Management Office) and PED (Project Engineering and Design).
"Reduce waste sent to landfill which is in line with Saudi Vision 2030 to reduce waste sent to landfill by 90% by 2030 Develop clean sources of energy which is also in line with the Kingdoms vision to achieve net zero by 2060 Eliminate waste disposal costs, reduce energy related costs and develop alternate revenue streams"
"Divert waste from landfill up to 110,000 tons of manure per year by 2025 (at full expnasion) Generate up to 47,000 MWh per annum of clean, renewable energy Reduce GHG emissions up to 76,000 tons per annum by reducing energy consumption from non renewable sources"
Reduces waste sent to landfill and GHG emissions from non renewable energy sources
3/1/2024
5.75 megawatts
18%
47610000 KWh
76807
Mavitec
Sustainability team (2 staff members) worked closely with the innovation center (3 staff members) in the holding group to develop this project. Project commercial and technical feasibility was developed in collaboration with project management (2 staff members). Operations team (2 staff members) were involved to assess current practices and practical application of the solution
Project has been divided into multiple stages. The first stage is to setup a manure drying plant as a primary processing stage. Land and licensing is currently being worked on at this stage. In parallel, we are also looking at funding partners for the latter stages.
Y. K. Almoayyed & Sons is one of the largest diversified business groups in the Kingdom of Bahrain with interests in automotive, heavy equipment, consumer electronics, building systems, and more. The group believes in growing the business ethically, sustainably, and responsibly for a better future.
Our objective is to operate in a sustainable manner. To achieve this, we have initiated several projects - solar power, water recycling, digitalization, and more. This has helped us not only cut down on expenses on non-renewable energy, paper use, etc. but has helped the company's environmental credentials. The ESG projects are spearheaded by the company's Corporate Purchase department the leadership of the company CEO - Mr. Alok Gupta in coordination with the finance department, and all the relevant operational heads.
Our target is to be a net zero power-consuming entity by 2025. We have implemented solar power projects which cover 20% of our power requirements to date. This was achieved in September 2022. We have complemented this initiative by installing LED lights and replacing older AC units with more energy-efficient units to control our power consumption and eventually achieve our target of 100% of the power consumed through renewable sources sooner.
"Total Solar Power Generating Capacity Installed: 1.14 MW Total Solar Power Units Generated per Year: 1.74 Million kWh Total Carbon dioxide Reduction: 1,045 Tons per Year Total Amount of Coal Burning Avoided: 619 Tons Total No. of Oil Barrel Consumption Avoided: 3,488 Barrels Total No. of Equivalent Tree Seedlings Grown over 10 Years: 20,928 seedlings"
The solar power project is one of the most critical for our company's overall sustainabolity goals and ambitions. Once we achieve 100% power consumption through solar, it will lead to annual savings of USD 680,000
9/11/2022
1.14 megawatts
20%
1,743,948 KWh
1045
Almoayyed Solar
The management was presented with a cost benefit analysis of the solar project. Not withstanding the significant capital expenditure, the management was convinced of both the financial and non-financial benefits that the project presented. The project implementation was done by a third party vendor and this was coordinated by lean team for 10 members from our organization.
With the comissioning of 2 solar power projects we are generating 1.74 Million kWh annually through renewable sources which constitutes 20% of our annual requirements (8.8 Million kWh).
AA
We have decided to enter into a 20-year solar power purchase agreement to cover our electricity consumption in our operations of our 2 cement mills, bag packing and bulk loading units. We have also installed wind turbines on a trial basis.
"1.This is in line with the Government of Bahrain Vision on sustainable development goals for 2030. 2. As a bulk consumer of electricity affordable & Clean Energy which is resilient to weather related impacts of climate change. 3. cost savings by using the green energy. 4. Utilization of unused spaces available at our premises. 5. An energy system based on distributed, and de centralised generation is more flexible than depending on a single source."
This power purchase agreement of 20 years is estimated to generate 3GWh of clean energy in 1 year and to reduce 40,658 Metric Tonnes of CO2 equivalent which is equivalent to 8,760 cars taken off the road or 672,280 trees saved. With a 1760 KWp estimated system capacity, we are saving 38% of costs compared to EWA Tariff.
it will indeed, boost, incorporate and enrich our overall environmental improvements and related savings strategies.
4/1/2023
1.762 megawatts
38%
3,000,000 KWh
40658
Pavillion energy, Bahrain
mutually project teams have been engaged to carry out this project focusing on the overall Enviromental and saving objectives. this is a solo responsibility taken care by the supplier the pavilion energy, and our relevant team has been acting as a support and a secondary arm.
we are in the evaluation stage were focusing on a 30% of the power requirements of the total solar coverage and in the future the remaining will be considered.
Emirates Glass was established to become the leading provider of energy efficient architectural glass in the Middle East. Since its inception the company has been an integral part of Dubai’s growth and evolution, having supplied glazing and expertise for many of the iconic buildings across the city.
Emirates Glass LLC and LumiGlass Industries installed photovoltaic (PV) rooftop systems on its facilities in the UAE, promoting the use of solar energy.
"The implementation of solar panels on the two glass manufacturing facilities will reduce CO2 emissions by approximately 1,200 tonnes annually, equivalent to planting approximately 30,000 trees. These solar panels are expected to generate around 2,800 megawatt-hours (MWh) of green energy per year from these two locations."
"Constructed with approximately 3,000 PV panels, the 1.20 megawatt-peak (MWp) solar rooftop system is expected to produce over 1,900 (MWh) annually. The electricity generated by the solar roof top will cover around 19% of Emirates Glass facilities energy needs. Another solar PV rooftop was finalized with TotalEnergies for Lumiglass Industries. The 0.55 MWp solar rooftop system is made up of more than 1,400 PV panels. The solar system is expected to produce over 800 MWh per year and will cover about 18% of the facility’s energy needs."
These projects and partnerships are part of Emirates Glass' commitment to adopting modern technology and innovative concepts as part of the Company’s efforts to achieve business excellence and sustainable growth.
12/28/2021
1.75 megawatts
19%
2,800,000 KWh
1200
TotalEnergies photovoltaic (PV) rooftop systems
Our Group Company Dubai Investments, the Emirates Glass and LumiGlass facilities have played an active part in the company’s clean, green and sustainable initiatives.
Emirates Glass LLC will continue to adapt modern technology and innovative concepts as part of the Company’s efforts to achieve business excellence and sustainable growth.